I had the same problem with moving the management port to a dvSwitch. I solved it by moving one nic at a time from my test host to the dvSwitch. Move one nic, then move the management port, then move the second nic. By doing it in that order I was able to migrate everything to my dvSwitch. Maybe I misunderstood your situation, but hopefully this helps.
↧